UC Davis Vet Med 3A | Gladys Valley Hall (Vet Med Instructional Facility)


Location: 
UC Davis Campus
Date Completed:  2007 (3A) | 2006 (Gladys Valley Hall)
Services Provided:  Civil Engineering
Owner:  UC Davis
Architect:  SRG Partnership
Contractor:  Flintco

Key Contributions: 
utility location coordination

Sustainable Design:
  LEED Platinum certified (Gladys Valley Hall)

Awards:
  • 2005 Inaugural UC System Sustainability Conference: Best Overall Sustainable Design Award (Gladys Valley Hall)

Details

Vet Med 3A: 
5-stories | 165,000 SF | teaching laboratories | faculty research labs | research support facilities | clinical facilities | offices for faculty and administration   
Gladys Valley Hall:  55,000 SF | teaching and student program facilities | student support space | alumni, faculty and student facilities

Cunningham Engineering provided complete civil engineering services from schematic design thorough construction phase services for both the $80 million Vet Med 3A project and $25 million Gladys Valley Hall Veterinary Medicine Instructional Facility.  We developed preliminary designs and cost opinions for routing the underground utilities infrastructure, including water, firewater, storm drainage, and sanitary sewer, electrical, and natural gas. 

Crucial to the success of these projects, Cunningham Engineering provided utility location coordination between this project and a major Health Sciences Subdistrict utility infrastructure project.